Confirm more than tramming height and width. The evaluation should include turning envelope, ground conditions, boom or attachment operating space, grade, visibility, overhead services, refuge or passing areas, setup/stabilization requirements, and maintenance access at the expected work location. A machine can fit through a heading and still be difficult to work around if the operating envelope is not reviewed.