Include it when the mine needs accountability beyond panel or system fabrication. Installation and commissioning may be required where field conditions, integration, documentation, testing, or startup support affect performance and acceptance. The RFQ should clarify what is supplied, what is installed, what is tested, who provides site access, and what documentation is expected at handoff.