Procurement should compare more than the invoice price. Review downtime, lead time, remaining service life, reliability risk, upgrade potential, operator training, parts strategy, warranty/support, and whether the rebuilt unit still fits the future mine plan. A rebuild can be financially strong when it restores needed capability with controlled scope. It is not automatically the right answer if the machine no longer matches operating requirements.