TES Inc.

Where should engineering confirmation be required before publishing or relying on a MineReach claim?

Engineering confirmation should be required for capacity, reach, stability, attachment/module suitability, final production weight, tire selection, safety documentation, options, and any claim tied to site-specific performance.

Exit mobile version