Narrow-vein evaluation should start with actual travel and operating envelope. Review tramming height, width, turning radius, service access, load requirements, operator visibility, and the task location rather than assuming any smaller unit will fit. Narrow-vein equipment can solve access issues, but it may also change capacity, configuration, and maintenance planning. The final decision should include operations, maintenance, and safety review.